Tambunan, P. H., & Zetli, S. (2021). PENGUJIAN METODE LINE BALANCING TERHADAP PRODUKTIVITAS DAN WAKTU TUNGGU PADA LINE SEWING PADA PT BATAM BERSATU APPAREL. Computer and Science Industrial Engineering (COMASIE), 3(5), 12–21. Retrieved from https://forum.upbatam.ac.id/index.php/comasiejournal/article/view/2329